Indra Setiawan, Bintang Candra Perdana, Neilinda Novita Aisa
Optimisation of the Partial Runner Set-up Process in Plastic Injection Moulds Using Eight Steps in the Motorcycle Industry
Číslo: 1/2024
Periodikum: Quality Innovation Prosperity
DOI: 10.12776/qip.v28i1.1980
Klíčová slova: plasticinjection; motorcycle industry; optimisation; partial runner; set-up process
Pro získání musíte mít účet v Citace PRO.
Methodology/Approach: This study uses an 8-Step improvement approach combined with several methods, including Focus Group Discussion (FGD), Quality Cost Delivery Safety Moral (QCDSM), and Specific Measurable Achievable Relevant Timebase (SMART) method.
Findings: This study found the cause of the partial set-up work being less than optimal due to problems with the Man, Method, and Machine factors. The results of this study show that the set-up time decreased from 240 minutes to 73.4 minutes or 68%. Meanwhile, the process cost for the partial set-up itself decreased from $75 to $3 or decreased by 97%.
Research Limitation/implication: This research has limitations in the partial set-up process, which is less than optimal in plastic injection family-type moulds in the Motorcycle Industry.
Originality/Value of paper: This research has value in optimising the production of plastic injection family-type moulds by reducing set-up time and operational costs for making spare parts in the Motorcycle Industry