The selection of tunnel construction program for intercity railroad tunnel under the airport must consider the limitations of environmental conditions and the scale of tunnel construction, and the impact of construction on the airport must be controlled within safe limits. Combined with the intercity rail transit tunnel project through the airport area surrounding environment and engineering geological conditions, the use of theoretical analysis, numerical simulation and other methods, comprehensive navigation, technology, construction period, cost, construction impacts and other aspects of the comparative analysis of the tunnel construction method of open excavation method and shield method, the results show that: (1) Due to the soft soil and groundwater in the tunnel excavation area, the risk of open excavation is greater, while the shield method is more suitable for longer silty soil tunnels without affecting the navigation, accordingly, the shield tunnel construction is more suitable for the tunnel construction under the airport. (2) Open excavation method has the shortest construction period to meet the requirements of rail transit, the unit cost is between 1 and 2 shield machines, and the total cost is close to 2 shield machines; for lower total cost, choose 1 shield machine, for shortening the construction period, choose 2 shield machines. (3) The maximum ground settlement caused by shield tunneling construction is 20mm, the maximum vertical differential settlement perpendicular to the tunnel is 2.8cm, and the maximum differential settlement is 0.93 ‰. On the one hand, it meets the requirements of airport settlement control, and on the other hand, it has little impact on the vertical connecting road and west station apron, and will not affect the opening of the airport runway and the operation of the terminal.