Financial Evaluation of the BIM Model Coordination Process in Construction

Daniel Kobik, Lubos Verny, Josef Zak

Financial Evaluation of the BIM Model Coordination Process in Construction

Číslo: 2/2024
Periodikum: Business & IT
DOI: 10.14311/bit.2024.02.11

Klíčová slova: clash detection; digital information model; financial evaluation

Pro získání musíte mít účet v Citace PRO.

Přečíst po přihlášení

Anotace: Although the decision whether to use the BIM method for a project has many factors, the purpose of this work is to describe financial benefits that comes with using the method in the field of project coordination in design phase. On the following pages it will be described how the tools of the BIM method can be used to detect collisions in comparison to performing classical coordination only using 2D coordination and visual inspection. The cost of removing the collisions will be determined for the case in which it would not have been detected during the design phase, but the collision is dealt with during construction. The difference between BIM and classical detections will be determined as the added value of using BIM method.